Archive for Month: August 2016
Compressor Station PLC Upgrade
Impel completed a rush PLC5 replacement in May 2016 for a Central Alberta Midstream gas producer. A power outage caused the communication cards in an antiquated PLC5/40 rack to permanently fault. Attempts were made to replace the faulty cards, but each replacement card had the same memory fault due to […]
Canola Oil Press Upgrade
In August 2016 Impel Systems completed an upgrade for a Central Alberta canola oil producer. The existing control system was upgraded with new remote I/O to control three new canola oil presses, along with controls for numerous augers, limit switches, a level sonar, and seed cleaner shaker. The existing system […]